DEWA

Infrastructure Projects No Objection Certificate

Infrastructure Projects No Objection Certificate

Apply Online

Service Description

This service enables the registered Service Authority, Consultants, Contractors and Developers to request Infrastructure NOC for Road Projects, Network Service Projects, General Projects, House Connections and Building Projects Permit within Right Way (ROW)/ or within or adjacent to DEWA’s reservations / Premises before start of work through RTA E-NOC online system and/or availing through DEWA  as applicable.
The NOC types includes Design, Construction, Trail Trench, Service Information, Shop Drawing, and Design & Build



Service Category & Type

  • Subsidiary
  • Regulatory

Customer Segment

Infrastructure & Network Direct Customers:

  • Consultant
  • Contractor

Service Integrations

  • Applicable with E-NOC system with RTA

Service Partners

  • RTA

Package

  • N/A

Service Limitations

Automatic cancellation of the NOC application from RTA E-NOC system for the following cases:

  • The customer fails to obtain NOC approvals for the online and manual NOC submission within 60 days.
  • The customer does not make the RTA E-NOC application on DEWA Customer Portal, with the RTA-NOC application reference number, within 7 working days.
  • The validity of NOC is 6 months from the date of issue and to be renewed within 15 days before expiry.

Notes

Service Requirements

Mandatory Documents:
Depending on the project type and NOC application type, the NOC application should comply with the requirements of the Infrastructure NOC Submission Guideline and NOC Infrastructure Technical Manual; which can be found on DEWA portal.


Service Steps & Procedures

Work within right of way

  • Apply for NOC online on the RTA system (e-NOC) through the link: (https://noc.rta.ae)
  • For online applications, customers should attach their requirements as mentioned in the NOC Submission Guidelines.
  • For manual application, get the online RTA reference number from e-NOC and upload the necessary documents on the DEWA Customer Portal at (https://crm.dewa.gov.ae/irj/portal/anonymous).

Work inside DEWA lands & premises

Service Fees

  • Free

Service Channels

Service Delivery Time

Service Name Delivery Time
Information Services
Service Name
3 working days
Delivery Time
Trial Pits
Service Name
3 working days
Delivery Time
House Conncection NOC
Service Name
3 working days
Delivery Time
General NOC
Service Name
5 working days
Delivery Time
 Dubai Building Permit System NOC (DBPS)
Service Name
 3 working days
Delivery Time
NetworkNOC
Service Name
7 working days
Delivery Time
Road NOC
Service Name
7 working days
Delivery Time

Journey Map

Beneficiaries
Project Owner
Contractor/Consultant / Developer/ Services Authority

Key Information

This service presents different customer journeys based on specific scenarios:

  • For projects within Right of Way (ROW), apply ONLY through Electronic NOC portal (e-NOC) of RTA.
  • For "Design and Build NOC" service, apply ONLY through Dubai Building Permit System “DBPS” of Dubai Municipality.

    * For the above scenarios, DEWA will receive proactively your request through digital integration, and it will be processed and completed seamlessly. No need to apply through DEWA channels.

  • For projects within or adjacent to DEWA’s reservations and premises, apply through DEWA channels.
1
Getting Service Information
Project Owner
  • I search for Information related to Infrastructure NOC.
Contractor / Consultant
  • I search for Information related to Infrastructure NOC.
2
Applying for the Service
Contractor / Consultant
  • I enroll/log-in to RTA Website/ Dubai Building Permit System “DBPS” of Dubai Municipality/DEWA Website.
  • I go to the service, fill-in service application, attach/upload all required documents and submit the application.
3
Interaction During Processing
Contractor / Consultant
  • Upon submission, I receive notification with reference number.
  • I receive a notification with application status as approved/objected/commented.
    * If objected: I receive notification to submit a new application with correct/further information and if needed I may request for technical discussion through DEWA portal.
    * If commented: I receive notification to re-submit the application with correct/further information and if needed I may request for technical discussion through DEWA portal.
4
Completing Service Interaction
Contractor / Consultant
  • I access RTA Website/ Dubai Building Permit System “DBPS” of Dubai Municipality/DEWA Website to track the status of the Infrastructure NOC application and download the NOC once ready.

Frequently Asked Questions

How can I submit an Infrastructure NOC application?

To request this service, visit the ’Infrastructure NOC Application’ page.

What type of Infrastructure NOC application can I submit?

You can submit NOC’s that do not require RTA eNOC number and also NOC’s which are submitted in RTA eNOC system without attachments (Manual Version).

Are any attachments required while submitting an Infrastructure NOC application?

Yes, all Infrastructure NOC applications require attachments based on NOC Type and Project Type. For attachment requirements, please use Infrastructure NOC Submission Guidelines those are available on DEWA portal

What file extensions can I attach?


The file extensions you are allowed to attach are:
pdf, zip, dwg, dgn, rar

What rules do I have to follow while filling in the Infrastructure NOC application?
  • Required fields must be filled in (required fields are either in red or marked with an asterisk *).
  • Enter only numeric values in numeric fields (e.g. P.O. Box)
  • Project Number, Project description, Subject Description, Project Type, NOC Type, and DLTM Coordinates should be filled

How will I know if there are data entry errors for my submitted Infrastructure NOC application?

Error messages will appear before the form can be submitted.

What happens to my Infrastructure NOC application after I successfully submit it?

The Infrastructure NOC application will go to Infrastructure Information and Permits Department (II&PD). All acceptable NOC applications will be processed for applicable Road Projects, Network Service Projects, General Projects, and House Connections Projects within the Right of Way, DEWA reservations and DEWA Premises (As applicable).

You will receive a confirmation message through SMS and an email upon successful submission with a DEWA reference number.

The service is dedicated specifically for project applications those require DEWA approval only e.g Shop Drawing, DEWA reservations and DEWA Premises, On Hold Areas in main applications

How do I track the status of my submitted Infrastructure NOC application?


To track your Infrastructure NOC application, please follow the following steps:

Will the Infrastructure NOC application be approved directly?

Before any decision is taken on Infrastructure NOC application, it will be processed by Infrastructure Information and Permits Department (II&PD) and on final stage will either be APPROVED or OBJECTED. In between processing if II&PD requires any clarification, technical comments will be sent.

Which are Incomplete Infrastructure NOC applications?

Any NOC submission which is not as per DEWA Infrastructure NOC Submission Guidelines is considered as incomplete application. To avoid incomplete submission, please use Infrastructure NOC Submission Guidelines available on DEWA Portal.

How can I resubmit the Infrastructure NOC applications?

To resubmit an Infrastructure NOC application, follow the following steps:

  • Login to DEWA CRM Portal https://crm.dewa.gov.ae/irj/portal/anonymous
  • Select “Track Your Applications” Under the Estimate Payment and Tracking
  • Provide the Search Criteria including the NOC No.
  • Click on Search
  • Click on Edit
  • Read the comments under Interaction History
  • Upload the attachments
  • Add customer notes
  • Click on the check box
  • Click on the Resubmit Tab

Can I submit Infrastructure NOC manually?

No, all Infrastructure NOC applications are to be submitted digitally only (RTA ENOC system or DEWA Customer Portal) as applicable. If you face any difficulty while applying NOC, you can contact Infrastructure Information & Permits Department (II&PD) at the below address:-

Infrastructure Information & Permits Department

Tel:- +971-4-3221614
Email: - iip.noc@dewa.gov.ae

Is the Infrastructure NOC eService free of charge?

Yes, the Infrastructure NOC is provided free of charge.

How can I use Infrastructure NOC Customer Portal for NOC Submission / Resubmission?

Infrastructure NOC User Manual is available on DEWA portal in an easy to use manner.

What publications are available for Infrastructure NOC Services?

Below documents are available for NOC Services


  • Infrastructure NOC Technical Manual
  • Infrastructure NOC Submission Guidelines
  • Infrastructure NOC User Manual

What is the expected reply time for each NOC?


The expected reply time for each NOC is as per below however, for special cases might take more depending on case.

  • Information NOC: 3 Working Days
  • Trial pits NOC: 3 Working Days
  • House Connection NOC: 3 Working Days 
  • General Projects: 5 Working Days
  • Dubai Building Permit System NOC (DBPS): 3 Working Days
  • Networks Projects: 7 Working Days
  • Road Projects NOC: 7 Working Days

What do I do if I face issues when applying for the service?

Please visit our Support page for assistance

 
 


Privacy & Security Policy

Dubai Electricity and Water Authority (DEWA) is committed to protecting the rights of the users of its website, and keeping data and information secure. We have created this privacy and security statement to explain the current information management practices on our websites.

Information Collection and Usage:

DEWA does not collect any personal information about you when you visit its website, unless specified, or you choose to provide this information to us. However, upon your visit, the following information is automatically collected and stored:

  • The IP address from which you access the Internet and the date and time of your visit to our website.
  • The pages you visit (recorded by the text and graphics files that compose the page)
  • DEWA use this information solely for statistical and monitoring purposes and to help us identify which services are most or least interesting to our visitors, as well identifying website performance.

We may use third party tools or software for conducting statistical analysis. However, only certain pieces of aggregated, non-personal information, such as the number of users who accessed our website or most visited pages, are collected. Such information does not identify you individually.

DEWA keeps all collected information confidential except where disclosure is enforced or required by law, or as part of requirement to protect the rights or properties of DEWA.

Security of Transactions:

Please be assured that this site has security measures in place to protect the information you provide us. We use encryption methods to protect all information, which is deemed to be sensitive, or any other data that should remain secure to meet DEWA’s, federal, or local legal requirements.

Links to third-party websites:

DEWA's website may provide links to other web sites. However we are not responsible for the accuracy of the contents of these sites or their mechanisms for information collection and usage.

If you connect to any other site through DEWA’s website, you need to read its Security & Privacy Policy to determine its practices related to information collection and usage.

Security & Privacy Policy Changes:

DEWA reserves the right to change this Security & Privacy Policy at any time. The amended version of the Security & Privacy Policy will be always published only on DEWA's website.

Privacy intrusion:

If you doubt that your privacy is being compromised, follow these steps immediately:

  1. Close all browsers
  2. Change your password immediately
  3. Inform us by email on customercare@dewa.gov.ae or phone on +971-4-601-9999.

What are Cookies?

Cookies are small text files that are stored in your device when you visit a website. DEWA uses cookies to improve your overall website experience.

How does DEWA use Cookies?

DEWA’s website cookies store website preferences like preferred language, font-size, or specific version (e.g. high-contrast). Once your preferences are set, you do not need to specify them again for DEWA’s site. DEWA also uses cookies for parts of the website that require registration to access content.

DEWA is committed to the protection of its customers’ private information and does not track individual users or their identity.  DEWA only accesses the system information of the device, the website is being viewed on, to gain useful knowledge about how it is used. The collected information is used solely for statistical and monitoring purposes to help DEWA improve the user experience of the services and to identify the performance of DEWA’s services.

3rd Party Cookies:

DEWA also uses 3rd party tools or software, such as Google Analytics, to track web statistics. In this case, Google will place a 3rd party cookie on your computer. This is also the case with Google Maps across the site.

Any information collected by way of these cookies will be stored and managed by DEWA as per the approved DEWA Website and Mobile App Privacy Policy. If you don’t wish to store cookies for DEWA’s website, you can modify your browser so that it notifies you when cookies are sent, disable the cookies collection feature, or delete cookies that have already been set.


Disclaimer:

DEWA is not responsible for any technical, hardware or software failures of any kind; lost or unavailable network connections; incomplete, garbled or delayed transmissions. It assumes no liability for any direct, indirect, incidental, punitive, consequential or psychological damages as a result of visiting or using its Website or loss of services, income or welfare resulting from any virus that may infect computer equipment used to access its sites. Under no circumstances will DEWA be liable for any damages or injury that result from the use of the materials on this site and the user shall indemnify DEWA from and against all liabilities resulting from the user's failure to observe these terms and conditions. DEWA does not warrant that information currently accessible is up-to-date.