Solar PV Equipment Eligibility

Solar PV Equipment Eligibility

Circular

Important Points

1. The submission of Solar PV Equipment enrollment applications shall be done through the DRRG Equipment Portal. For any enquiries or support related to the solar PV equipment enrollment, send email to pvequipment@dewa.gov.ae

2. The equipment that meets the minimum eligibility criteria will be added in the List of Eligible Equipment. This list is periodically updated.

3. The mandatory compliance certificates shall be issued from 3rd party ILAC-accredited labs according to the standard ISO/IEC 17025.

Note the old PDF list of Eligible Equipment is obsolete and shall not be consider for solar installations.

Solar PV Equipment Overview

In line with Dubai’s vision to become a global hub for green economy, DEWA has launched the Distributed Renewable Resources Generation programme to encourage customers to adopt solar energy as a mean of producing their own electricity. Surplus production will be fed into DEWA’s power network while the owner will be credited for off-setting future use.

DEWA has committed to maintain high technical standards for these installations. Therefore, the solar PV equipment to be installed will undergo a rigorous process of verification to ensure compliance with the eligibility criteria set by DEWA based on international standards on quality and safety, as described in the following document:

DEWA Standards for Distributed Renewable Resources Generators.

In this document, please refer to:

Appendix C: List of Standards for Equipment:

C.2 PV modules.

C.3 Inverters.

Appendix D: Compliance Tests:

D.1 Interface Protection Systems for Low Voltage Connected RRGPs.

D.2 Interface Protection Systems for Medium Voltage Connected RRGPs.

D.3 Inverters for Low Voltage Connected RRGPs.

D.4 Inverters for Medium Voltage Connected RRGPs.

Minimum Eligibility

Minimum Eligibility Criteria (Please refer to the standards document in the "PV Equipment Eligibility Overview" section for details):

PV Modules: The minimum eligibility of the PV module depends on the compliance to the following standards:

  • IEC 61215-1-x/2
  • IEC 61730-1/2
  • IEC 61701

Kindly note that DEWA may also ask later for the compliance to IEC 60028-2-68. The compliance to IEC 62716 is required only for installations in special environments.

(Detailed guide available here)


PV Inverters: The minimum eligibility of the PV Inverter depends on the compliance to the following standards:


(Detailed guide available here)

Please note that additional to the above Compliance Certificates, the harmonic spectrum data for each PV Inverter is required to be provided for a successful application submission.



Interface Protections: The minimum eligibility of the Interface Protection depends on the compliance to the following standards:

Compliance to IEC 61010-1 is optional.


Equipment Registration Process

Manufacturers of PV Modules, PV Inverters and Interface Protection (or their Local Authorized Representatives) can register their solar PV equipment to be added to DEWA Shams Dubai List of Eligible Equipment through this DRRG Equipment Portal.




 DISCLAIMER:

Please note that the information presented on the DEWA website provides an overview of the manufacturers and equipment that meet the required standards based on type-test certification. However, this does not constitute an endorsement or warranty of any kind, whether expressed, implied or statutory, including but not limited to warranties of title, merchantability, satisfactory quality, fitness for particular purpose, warranty for performance, professional advice, professional financial guidance, and shall not be relied upon as the only source of information for purchasing, contracting, investment decisions or for executing other binding agreements.